BUILDING STAGES OF A DUAL OCCUPANCY HOME

 

Stage 1

Preconstruction

 
  • Formalise Plans & Documentation.

  • Soil Report & Engineering.

 

Stage 2

 Preliminaries 

 

Site Prep & Demolition

Hire Items

Set Out

Power Provision

Water Connection

Sewerage & Stormwater

 

Stage 3

Base Stage

 

Pump & Crane Hire

Termite Control

Foundation Reinforcing

Foundation Package

 

 

Stage 4

Frame Stage

 

Bricklayer

Frame Carpenter

 

 

Stage 5

Lockup Stage

 

Bricklayer

Fall Protection / Scaffolding

Metal Fascia & Gutter

Roof Tiles

External Lockup Carpenter

Internal Lockup Carpenter

Electrical Rough-in

Plumber Rough-in

Solar Hot Water

Ducted Heating & Cooling

Wall Insulation

Brick Cleaner

Ceiling Insulation

 

Stage 6

Fix Stage

 

Plaster

Shower Bases

Water Proofing

Cabinet Maker

Fix Carpenter

 

Stage 7

Completion Stage

 

Painter

Benchtops

Internal Tiler

Garage Door Supply

Plumbing Fit Off

Caulking

Electrical Fit Off

Heating Cooling Fit Off

Shower Screens & Mirrors

Sliding Robe Doors

Floor Coverings

Final Fit Off

Site Cleaner

House Cleaner

Fly Screens

Rendering

Fencing

Paving

Clothes Line & Mailbox

Landscaping

Inspection & Touchups

Handover

Hot Water Supply

Kitchen Appliances

 