We have documented, managed and been involved with the building stages for dual ocupancy homes, townhouse projects, apartments, retail and commercial, health, education to name a few disciplines.
Once your Town Planning Approval for your dual occ townhouse is in place, our registered drafting team will start the building permit documentation. Those documents include:
Architectural working drawings
Soil report
Structural engineering
Civil (drainage) engineering
Energy report
other reports as required
The Building stage for a residential project like a dual occupancy can be broken into the following stages:
Preconstruction
Construction preliminaries
Base Stage
Frame Stage
Lockup
Fix
Completion
Property Subdivision: These are the detailed steps in the Building the Dream.
BUILDING STAGES OF A DUAL OCCUPANCY HOME
Stage 1
Preconstruction
Fomalise Plans & Doc.
Soil Report & Eng.
Stage 2
Preliminaries
Site Prep & Demolition
Hire Items
Set Out
Power Provision
Water Connection
Sewerage & Stormwater
Stage 3
Base Stage
Pump & Crane Hire
Termite Control
Foundation Reinforcing
Foundation Package
Stage 4
Frame Stage
Bricklayer
Frame Carpenter
Stage 5
Lockup Stage
Bricklayer
Fall Protection / Scaffolding
Metal Fascia & Gutter
Roof Tiles
External Lockup Carpenter
Internal Lockup Carpenter
Electrical Rough-in
Plumber Rough-in
Solar Hot Water
Ducted Heating & Cooling
Wall Insulation
Brick Cleaner
Ceiling Insulation
Stage 6
Fix Stage
Plaster
Shower Bases
Water Proofing
Cabinet Maker
Fix Carpenter
Stage 7
Completion Stage
Painter
Benchtops
Internal Tiler
Garage Door Supply
Plumbing Fit Off
Caulking
Electrical Fit Off
Heating Cooling Fit Off
Shower Screens & Mirrors
Sliding Robe Doors
Floor Coverings
Final Fit Off
Site Cleaner
House Cleaner
Fly Screens
Rendering
Fencing
Paving
Clothes Line & Mailbox
Landscaping
Inspection & Touchups
Handover
Hot Water Supply
Kitchen Appliances
We can recommend a builder if you require one.
We can recommend all the external consultants- from surveyor to engineers and arborist if you need one.